Case study 1
BDEP Development for the Production of Butadiene-Nitrile Rubber
- Process simulation model development, material balance design
- Design of unique polymerization and distillation process equipment
- Author supervision at design, manufacturing and start-up stages
Working period: 3 months
Result:
Successful start-up of the plant within the established time limit, production of rubber of declared quality.
Plant capacity by rubber: 50 KTA
Case study 2
Optimization of existing extractive-distillation unit for Butadiene purification
- Audit of existing unit, collection of historical data
- Design of simulation model and its verification
- Optimization scenarios development
- BDEP development for chosen optimization solution
Working period: 6 months
Result:
- Decrease of Butadiene losses with acetylenic hydrocarbons
- Additional 2 mln USD profit achieved at the same capacity
- Project investment payback: 3 months
Case study 3
Feasibility study: Development of stable natural gasoline processing schemes
- Customer’s feed investigation including laboratory testing
- Development of a number of processing options based on product quality simulation
- CAPEX and OPEX estimation for each option, payback period determination
- Products samples preparation in the laboratory for further testing
Working period: 5 months
Result:
Justified scheme of production process with accurate prediction of financial characteristics. Pragmatic approach to investment project development